Application:
Potable Water
Keywords:
California , potable, cement rectangular, stratification, chloramine, nitrification
Reservoir Size:
Reservoir has a surface area of 1.32 acres with a maximum volume of 5.8 million gallons. Deepest depth is 20 feet when full, but will drop to a 12-foot operating depth periodically.
SolarBee Installation:
Date: Jan 2003. Installed one SB10000F with a 24-hour electric kit and roof-mounted solar rack, with intake hose set at 15.5 ft. In June 2005, the single SB10000F unit was changed out to two (2) SB1250v12 units, one deployed on either side of the baffle wall.
Project Objectives:
Objectives were to thoroughly mix the reservoir to prevent stratification, maintain uniform water age, and to prevent nitrification after the City converted to a chloramine based treatment system in February 2004.
Whether solar- or electric-powered, SolarBee has the most competitive and complete tank mixer offering for the job. For more information on this or any other SolarBee installation, please call 866 437 8076.